The concept of lean construction on commercial or industrial building projects involves the application of what commonly is referred to as lean thinking to the construction industry. The principles underpinning so-called lean thinking stem from manufacturing processes, concepts which are then applied in the construction industry.


As is the case in the manufacturing process, from which it is derived, lean construction necessitates an end-to-end examination of the design and construction process. A seamless design and construction process is developed, that necessarily involves all primary (and, more often than not, secondary stakeholders from the project's inception. All principals are brought together even before the first line is drawn on the design concept itself.


Because a contractor is responsible for ensuring the seamless implementation of the design, and orchestrates the various elements of the construction aspect of a project, the contractor has a uniquely ubiquitous and vital role in a lean construction system. Thus, understanding lean construction from the perspective is vital in recognizing the functionality of this construction scheme.


Four Fundamental Principles of Lean Construction from a Contractor's Perspective


First, when it comes to the fundamental principles of lean construction from a contractor's perspective, the scheme necessarily specifies what creates project value from all perspectives, but most particularly from that of the customer. In other words, at the heart of any commercial lean construction endeavor is the ability of the contractor to fully understand the customer's vision and to aid in translating that to other principals in the construction process and, in some instances, during the design segment as well.


Second, a contractor must succinctly identify all steps and milestones throughout the project stream. This element does require close interplay between the customer, principals associated with the design phase, and the project contractor. This is a notable departure from traditional construction practices because a contractor's role during the design and associated phases typically is minimal to nonexistent. Indeed, oftentimes in the traditional model, a contractor isn't even on board during the design phase of a commercial construction project.


Third, actions associated with a commercial construction project, from design to actual building of a structure, must be inherently capable of creating overall project flow. In other words, no element of a construction project can impede the flow that underpins a commercial lean construction. This underscores the necessity of all principals being involved from the outset of the project.


For example, a common impediment to flow following a traditional construction scheme is a delay in delivery of necessary materials to the construction site. The odds of this occurring are significantly reduced, if not eliminated all together, through a commercial lean construction process that focuses on keen planning from day one.


Making those actions that create value flow • Only making what is pulled by the customer just in time • Striving only for perfection by continually removing successive layers of waste


Finally, a fundamental principle of lean construction from a contractor's perspective is continually striving to remove levels of waste from the project. This effort, most notable overseen by the contractor, better ensures scheduled project completion and preventing cost overrides.


Cost Savings Through Lean Construction


Commercial lean construction as a process and practice is new to the scene in both the United States and United Kingdom. With that said, it is being utilized on more commercial construction projects in both countries, as well as in some other nations, with each passing year.


In addition to better realizing the vision of the customer or owner of a commercial construction project, lean construction clearly is demonstrating its utilization as major cost-saving device. Research and analysis of cost savings associated with commercial lean construction projects in the United States is limited, due to the newness of the process in the U.S.A. Nonetheless, reliable evidence suggests that project cost reductions or savings can be upwards to 30 percent when lean construction is utilized in lieu of traditional commercial construction practices.


Historical Summary


As noted, lean construction is a relatively new concept. Lean construction is the brainchild of Lauri Koskela, who set forth the essential elements of this process more fully at the start of the 21st century. Lean construction, as comprehensive concept, arose out of about a decade's worth of research, investigation, and design undertaken by Koskela, beginning in about 1992. Koskela initially introduced lean construction concepts in the United Kingdom, where it received a positive reception and became the paradigm on commercial projects in that country with increasing regularity. From the U.K., lean construction migrated across the pond to the United States.


 


Jessica Kane writes for Advance Online, a leading provider of web-based OSHA. DOT. and HAZWOPER training. 

 